Maintenance Department – About Us

Welcome to the Maintenance Department

Our staff is responsible for the planning and implementation of all maintenance projects throughout the district.

It is important that students, teachers, support staff, parents, and community members want to come to our schools. That is why we work to ensure that the district’s 17 school sites and two administrative buildings are kept to a standard level of care that provides an environment that is safe, comfortable, and conducive to learning. A safe and comfortable school communicates a message to students and teachers that they are respected and special individuals; and that education is a critical component of our society.

Our ten Maintenance Specialists’ responsibilities include, but are not limited to, the maintenance and repair of the district’s Alarm Systems, Carpentry, Concrete, Construction, Electrical, Heating, Ventilation, and Air Conditioning (HVAC), Keys/Locks, Masonry, Painting, and Plumbing. Our specialists are hired because of their expertise in specific skill areas, but they are also called upon to fulfill general maintenance duties as needed. Currently, our team consists of two Alarm/Electrical Maintenance Specialists, two HVAC Specialists, two Carpentry/Locks/Keys/Doors Specialists, one Plumbing Specialist, and three Maintenance Specialist I’s who complete the majority of general maintenance and repair projects.

Projects Out to Bid

Asphalt Multiple Sites

Mandatory Bid Walk
March 6, 2019
3:30 PM
Start at Heron School, 5151 Banfield Drive, Sacramento, CA 95835
 
Bid Doc
 
Bid Specifications
 
Photos:
Heron School
H. Allen Hight Front / H. Allen Hight Rear
NP3 Middle/High School
Leroy Greene Academy
Two Rivers Elementary
 
 
Bids Due
March 20, 2019 
3:30 PM
 
 

Projects in Construction

 

Project Contractor Expected Completion
NP3 Exterior Paint HB Restoration August 1 2019
NCS Exterior Paint HB Restoration August 1 2019